Skip to main content
Putra Etam Lestari (PESI)

Bringing Idle Wells Back to Sustainable Production

PESI is an upstream oil and gas support services company focused on the reactivation, production optimisation, and operation of wells with remaining potential — grounded in well data, fit-for-purpose technology, and HSSE compliance.

PESI operating area with a rig unit and supporting facilities in the field
11–15 BOPD AR-54 production track record, Arahan Field
Safety First

Safety is the precondition for every job in the field.

Integrity

We uphold honesty, compliance, and sound governance.

Sustainability

We manage operations and the environment for a better future.

Teamwork

We work across functions to deliver the best operational results.

About Us

A Dependable Partner for Production Recovery

PT Putra Etam Lestari (PESI) turns idle well potential into safe, measurable production. We integrate subsurface, well service, artificial lift, production operations, and HSSE capabilities to deliver incremental production that can be verified.

After proving its reactivation capability at the Arahan Field, PESI was appointed to carry out the idle well cooperation at Limau Field, South Sumatra, under a 2026 contract with PT Pertamina EP.

A PESI well site in the late afternoon with production units installed
Since 2022
Upstream oil & gas support services
Our Services

Integrated Solutions across the Full Reactivation Cycle

PESI covers the complete chain — from candidate well selection through to volume reconciliation at the sales point.

01

Screening & Subsurface

Candidate selection, well data review, target zone definition, and technical risk mapping.

02

Well Service

Clean-out, sand bailer, scraper, swab test, and well potential evaluation.

03

Artificial Lift

Selection and installation of the lift method that suits each well.

04

Production Operations

Start-up, monitoring, optimisation, maintenance, and production volume recording.

05

Lifting & Reconciliation

Delivery, custody transfer point, sales point, and traceable production reconciliation.

Need your idle wells assessed?

Our team is ready to discuss reactivation potential and performance-based cooperation schemes.

5 Years Contract term following issuance of the work order
20 Wells Phased reactivation target across phases 1 & 2
11–15 BOPD AR-54 production track record, January 2025
3 Systems Active quality, OH&S, and HSSE management certifications
Where We Stand

Entering a New Operating Phase under a Long-Term Contract

The idle well cooperation at Limau Field, South Sumatra, forms the basis of PESI's long-term execution.

Active Contract

PT Pertamina EP × PESI

Idle well management cooperation at Limau Field, South Sumatra, under a remuneration scheme based on verified production.

  • Contract No. SP-083/PHR00000/2026-SO
  • Work order issued on 11 June 2026
  • Limau Field, South Sumatra
24 April 2026

Date the cooperation agreement was signed

5 Years

Contract term counted from issuance of the work order

11–15 BOPD

AR-54 production track record as of January 2025

Production & Lifting Chain

Connected through to Custody Transfer and Sales Point

Volume reconciliation preserves traceability from field production through to the basis for remuneration.

01

Well & Storage

02

Custody Transfer

03

Transport

04

Receiving Point

05

Sales Point

PESI personnel checking the production control panel in the field control room
Management Systems

HSSE and Quality Underpin Every Field Decision

Technical readiness is inseparable from safety, occupational health, the environment, process quality, and auditable documentation.

E-CHSEMS

Valid until 9 June 2027

ISO 9001:2015

Quality Management System

ISO 45001:2018

Occupational Health & Safety

HSE Plan

Site-specific control and reporting

Partnering for Production Recovery

Let us discuss idle well reactivation potential, performance-based cooperation, and your due diligence requirements.